E Rate 2021 Questions and Answers

For both the Switch Upgrade and the Access Point RFPs, Appendicies B.1 and B.2 MUST be completed.

Switch Upgrade 210013317

Please do not bid on this Form 470. It has been amended. Please see Switch Upgrade Amended 210018224 below.

Switch Upgrade Amended 210018224

Would you consider a different brand of switch?

We are working towards a complete Meraki network. As per the RFP, we require the switches to integrate and be controlled by the Meraki Dashboard.

Access Point Upgrade and Cabling 210019225

Access Point Deployment Map

How many new cable runs will there be?

There will be approximately 5-6 new cable runs. (See yellow markings in the map above, to download map, please right click and choose Save Image As.) We are trying to re-route existing cable where possible (See orange markings on the map above) , so I would highly recommend that you schedule a walk-through so you can get more exact measurements and determine which cables can be re-routed and where new cabling will be required.

Would you consider a different brand of access point?

We are working towards a complete Meraki network. As per the RFP, we require the access points to integrate and be controlled by the Meraki Dashboard.